NYC DOB record · M01452253-I1

48 Market Street

48 Market Street, Manhattan, NY 10002

Alteration filing in Chinatown-Two Bridges, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01452253-I1

48 Market Street

Manhattan, NY 10002

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
9 stories
Dwelling units
26
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01452253-I1 as a alteration filing at 48 Market Street, Manhattan, NY 10002. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 9 proposed stories and 26 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
9 proposed stories and 26 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1003275Applicant of recordSee the 42 filings that name Building Consulting Engineering
FiledSep 8, 2026
Current recordApproved
Proposed scale9 stories
Recorded cost$60,000

What the filing says

A public-record reading of the proposed work.

To propose vanilla box renovation for existing medical office at partial 001 floor as per plan filed herewith. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story condominium built in 1990, with 26 homes, on a 6,573 sq ft lot.

Built
1990
Floors
9
Residential units
26
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R7-2
Lot area
6,573 sq ft
Building area
21,923 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 30 open notices on record for this building, out of 53 notices on file; the most recent was issued Aug 14, 2025.

  • Construction

    Issued Aug 14, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP1 SPALLING MASONRY BALCONY RAIL CO PING.EXP2 HAS CRACK,SPALLING BALCONY SLAB ON THE 8TH FLOOR.REMEDY:REPA IR AND/OR REPLACE ALL DAMAGED FACADE AND APPURTENANCES

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Fail to certify class

    Issued Mar 30, 2022 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 27 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01452253-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01452253-I1
BBL
1002747501
Review type
Professional Certification
Existing stories
9
Proposed stories
9
Existing dwelling units
26
Proposed dwelling units
26
General construction