NYC DOB record · B01264830-I1

48 Monroe Place

48 Monroe Place, Brooklyn, NY 11201

Alteration filing in Brooklyn Heights, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01264830-I1

48 Monroe Place

Brooklyn, NY 11201

Alteration filing · status dated Sep 30, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01264830-I1 as a alteration filing at 48 Monroe Place, Brooklyn, NY 11201. Its latest published status category is Recorded as completed, dated Sep 30, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 30, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 5 filings that name Orsar Engineering
FiledAug 5, 2025
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$21,990

What the filing says

A public-record reading of the proposed work.

Install Roof Top Unit for Air Cooled Split System for Class Rooms at First Unitarian Congregational Society in Brooklyn located at 50 Monroe Place, as per drawings submitted herewith, in conjunction with application B01264855-I1.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story place of worship built in 1879, on a 1,937 sq ft lot.

Built
1879
Floors
4
Residential units
2
Building type
Place of worship
Land use
Public facilities and institutions
Zoning district
R7-1
Lot area
1,937 sq ft
Building area
5,418 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Feb 24, 2017.

  • Low pressure boiler

    Issued Feb 24, 2017 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT

  • Low pressure boiler

    Issued Oct 1, 2015 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT

  • Low pressure boiler

    Issued Mar 3, 2015 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01264830-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01264830-I1
BIN
3001918
BBL
3002380013
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0