NYC DOB record · M00835391-S1

485 5 Avenue

485 5 Avenue, Manhattan, NY 10017

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00835391-S1

485 5 Avenue

Manhattan, NY 10017

Alteration filing · status dated Oct 19, 2026

Current record
Approved
Proposed scale
14 stories
Dwelling units
184
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00835391-S1 as a alteration filing at 485 5 Avenue, Manhattan, NY 10017. Its latest published status category is Approved, dated Oct 19, 2026. The filing records 14 proposed stories and 184 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 19, 2026
Proposed scale
14 proposed stories and 184 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1035330Applicant of recordSee the 34 filings that name Desimone Consulting Engineering
FiledJun 14, 2024
Current recordApproved
Proposed scale14 stories
Recorded cost$95,000

What the filing says

A public-record reading of the proposed work.

Reinforcement of existing sidewalk vault slab prior to replacement of waterproofing and architectural wearing slab. no change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 14-story hotel built in 1914, on a 17,550 sq ft lot.

Built
1914
Last altered
2006
Floors
14
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C5-3
Lot area
17,550 sq ft
Building area
190,357 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 139 notices on file; the most recent was issued Aug 20, 2026.

  • Construction

    Issued Aug 20, 2026 — DUE TO WITHDRAWAL OF APPLICANT , DEPARTMENT OF BUILDINGS ORDERS YOU TO STOP ALL WORK AND JOBS IN CONNECTION WITH APPLICATION #M00835391-I1 IMMEDIATELY.

  • Failure to

    Issued Feb 2, 2023 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to post energy

    Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 11 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00835391-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00835391-S1
BBL
1012760001
Review type
Professional Certification
Existing stories
14
Proposed stories
14
Existing dwelling units
184
Proposed dwelling units
184
Structural work