NYC DOB record · S00855679-S1

488 Butler Boulevard

488 Butler Boulevard, Staten Island, NY 10309

New building filing in Tottenville-Charleston, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 28, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S00855679-S1

488 Butler Boulevard

Staten Island, NY 10309

New building · status dated Oct 26, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S00855679-S1 as a new building at 488 Butler Boulevard, Staten Island, NY 10309. Its latest published status category is Approved, dated Oct 26, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 26, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 5158499Applicant of recordSee the 137 filings that name Joseph M. Morace, A.I.A., Architect
FiledDec 12, 2023
Current recordApproved
Proposed scale3 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Proposed installation of plumbing, gas and stormwater fixtures and associated piping for a new two-family detached residence.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story two-family home built in 2025, on a 7,483 sq ft lot.

Built
2025
Floors
3
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R3X
Lot area
7,483 sq ft
Building area
4,535 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 28, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S00855679-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,037 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S00855679-S1
BBL
Empty in the source
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
3
Existing dwelling units
Empty in the source
Proposed dwelling units
2