NYC DOB record · M01436961-I1

488 Madison Avenue

488 Madison Avenue, Manhattan, NY 10022

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 30, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01436961-I1

488 Madison Avenue

Manhattan, NY 10022

Alteration filing · status dated Sep 28, 2026

Current record
Approved
Proposed scale
23 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01436961-I1 as a alteration filing at 488 Madison Avenue, Manhattan, NY 10022. Its latest published status category is Approved, dated Sep 28, 2026. The filing records 23 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 28, 2026
Proposed scale
23 proposed stories
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1035470Applicant of recordSee the 9 filings that name Bai Group
FiledSep 24, 2026
Current recordApproved
Proposed scale23 stories
Recorded cost$120,000

What the filing says

A public-record reading of the proposed work.

Interior renovation as shown on plans filed herewith. No change in use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01436961-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01436961-I1
BBL
1012870014
Review type
Professional Certification
Existing stories
23
Proposed stories
23
Existing dwelling units
0
Proposed dwelling units
0
General construction