NYC DOB record · M00320279-S1

49 Beach Street

49 Beach Street, Manhattan, NY 10013

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 8, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00320279-S1

49 Beach Street

Manhattan, NY 10013

Alteration filing · status dated Oct 6, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
8
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00320279-S1 as a alteration filing at 49 Beach Street, Manhattan, NY 10013. Its latest published status category is Approved, dated Oct 6, 2026. The filing records 8 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 6, 2026
Proposed scale
8 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1002805Applicant of recordSee the 894 filings that name Kz Engineering, P.C
FiledOct 5, 2026
Current recordApproved
Proposed scale8 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1870, with 8 homes, on a 1,334 sq ft lot.

Built
1870
Floors
5
Residential units
8
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
C6-2A
Lot area
1,334 sq ft
Building area
7,200 sq ft
Historic district
Tribeca West Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 8, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 22 open notices on record for this building, out of 32 notices on file; the most recent was issued Jan 9, 2026.

  • Construction

    Issued Jan 9, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DETERIORATING FACADE ON ALL EXPOSURES. DAMAGED/RUSTED WINDOW LINTELS, RUSTED OUT DEFECTIVE CORNICE, STEP CRACKING, AND CRACKED BRICKS ALL IN MULTIPLE LOCATIONS ON EXPOSURE 1 AND 2. REMEDY: REPAIR AND/OR REPLACE

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • 19 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 8, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00320279-S1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00320279-S1
BBL
1002140026
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
8
Proposed dwelling units
8
Scaffolding