NYC DOB record · M01421846-I1

49 Chambers Street

49 Chambers Street, Manhattan, NY 10007

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01421846-I1

49 Chambers Street

Manhattan, NY 10007

Alteration filing · status dated Aug 28, 2026

Current record
Approved
Proposed scale
15 stories
Dwelling units
97
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01421846-I1 as a alteration filing at 49 Chambers Street, Manhattan, NY 10007. Its latest published status category is Approved, dated Aug 28, 2026. The filing records 15 proposed stories and 97 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 28, 2026
Proposed scale
15 proposed stories and 97 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1079216Applicant of recordSee the 79 filings that name Dmytro Chornobryvets Architect,pllc
FiledJul 30, 2026
Current recordApproved
Proposed scale15 stories
Recorded cost$75,000

What the filing says

A public-record reading of the proposed work.

Interior renovation @ existing apartment 5G

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story condominium built in 1910, with 98 homes, on a 18,919 sq ft lot.

Built
1910
Last altered
1960
Floors
15
Residential units
98
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C6-4
Lot area
18,919 sq ft
Building area
209,951 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 182 notices on file; the most recent was issued Aug 28, 2025.

  • Construction

    Issued Aug 28, 2025 — FAILURE TO MAINTAIN.@TIME OF INSPCTN,OBSRVD BLDG W/SIDEWALK VAULT ON READE ST TO BE IN A STATE OF DSRPAIR W/SEVERELY CORRODED&DELAMINATD STEEL BEAMS,CRCKD&SPALLD MSNRY&CNCRTE,&WATER MVMNT.COMPLY W/ COMMISSIONER'S ORDER:DOB #072425FEU10103AK (CONTROL #341590) IMMEDIATELY

  • Immediate

    Issued Jul 28, 2025 — BRACE AND SHORE SIDEWALK VAULT WALLS AND CEILINGS ALONG READE STREET APPROXIMATELY 20' LONG BY 5' WIDE VAULT

  • Construction

    Issued Jul 24, 2025 — EMERGENCY WORK ORDER.@TIME OF INSPECTION,OBSRVD BLDG WITH SDWLK VAULT ON READE ST TO BE IN A STATE OF DSREPAIR W/SEVERELY CORRODED& DELAMINATD STEEL BEAMS,&CRCKD&SPALLD.OWNR TO ENGAGE NYSPE(W/O DISCIPLINARY ACTION)&DB REG CNTRCTR TO IMMED BRACE&SHORE THE ENT VAULT UNDR NYSPE SPRVSN

  • 7 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01421846-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01421846-I1
BBL
1001537501
Review type
Standard Plan Examination
Existing stories
15
Proposed stories
15
Existing dwelling units
97
Proposed dwelling units
97
General construction