What the filing says
A public-record reading of the proposed work.
Job filed to show cracs repairs on the 3 lowest steps of the entry stoop to the building as per plans filed herewith. no change in use, egress and occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story walk-up apartment building built in 1846, with 10 homes, on a 3,196 sq ft lot.
- Built
- 1846
- Last altered
- 1962
- Floors
- 3
- Residential units
- 10
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 3,196 sq ft
- Building area
- 5,773 sq ft
- Historic district
- Brooklyn Heights Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 14 open notices on record for this building, out of 33 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Nov 5, 2025 — FTC COMPLY W/COMMISSIONER'S ORDER CONTROL#348145 VIO#091625PI30201TC DATED 09/16/25 RQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 10/16/25&START BLDG REPRS UNDER PERMIT BY 11/15/25&COMPLETED/SIGN OFF BY 12/15/25 AS OF 11/05/25 A CAP&EVIDENCE OF REPR WORK WAS NOT REC'D IMMED COMPLY W/COMMISSIONER'S ORDER#348195 VIO#091625PI30201TC
- Construction
Issued Sep 16, 2025 — CORRECTIVE ACTION PLAN REQ'D-OBSVD CRACKED STAIRWAY TO FRONT DOOR @ EXP1. CRACKS ON SIDES OF THE STAIR RISER AND CRACK BTWN 2ND & 3RD FLR OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & SUBMIT CORRECTIVE ACTION PLAN BY 10/16/25 ADRESSING ALL CONDITIONS. BLDG TO BE REPAIRED UNDER PERMIT STARTING 11/15/25
11 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01307512-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01307512-I1
- BBL
- 3002670009
- Postal code
- 11201 · 6273 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 9
- Proposed dwelling units
- 9