NYC DOB record · M01339600-I1

49 West 27 Street

49 West 27 Street, Manhattan, NY 10001

Alteration filing in Midtown South-Flatiron-Union Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01339600-I1

49 West 27 Street

Manhattan, NY 10001

Alteration filing · status dated Sep 8, 2026

Current record
Recorded as completed
Proposed scale
10 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01339600-I1 as a alteration filing at 49 West 27 Street, Manhattan, NY 10001. Its latest published status category is Recorded as completed, dated Sep 8, 2026. The filing records 10 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 8, 2026
Proposed scale
10 proposed stories
Complete building dossierView all 3 filings associated with BIN 1015676Applicant of recordSee the 9 filings that name Jim Kusi PE
FiledDec 24, 2025
Current recordRecorded as completed
Proposed scale10 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Application being filed to show additional as-built details for facade repairs including terra cotta. no change in use, occupancy or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story office building built in 1883, on a 9,875 sq ft lot.

Built
1883
Last altered
1988
Floors
10
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
M1-8A/R12
Lot area
9,875 sq ft
Building area
83,050 sq ft
Historic district
Madison Square North Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 45 notices on file; the most recent was issued Feb 21, 2024.

  • Hazardous condition (facade)

    Issued Feb 21, 2024 — CYCLE 9A UNSAFE REPORT FILED

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • Elevator

    Issued Aug 10, 2021

  • 5 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01339600-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01339600-I1
BBL
1008290007
Review type
Standard Plan Examination
Existing stories
10
Proposed stories
10
Existing dwelling units
0
Proposed dwelling units
0
General construction