What the filing says
A public-record reading of the proposed work.
Filed herewith for existing dunkin' remodel with minor interior renovations including non-load-bearing partitions, millwork, and finishes. no change to use, occupancy, or meansof egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story store building built in 1925, on a 13,200 sq ft lot.
- Built
- 1925
- Last altered
- 1951
- Floors
- 1
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- R7-2
- Lot area
- 13,200 sq ft
- Building area
- 13,243 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 9 notices on file; the most recent was issued Sep 2, 2020.
- Fail to certify class
Issued Sep 2, 2020 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Fail to certify class
Issued Sep 2, 2020 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued May 6, 2017 — THE BOROUGH COMMISSIONER HAS ORDERED AN ADMINISTRATIVE STOP WORK ORDER FOR APPLICATION #121822162 DUE TO CONTRACTOR DENIAL OF AUTHORIZATION OF PERMIT. STOP ALL WORK IMMEDIATELY, MAKE SITE SAFE, REMOVE DEBRIS. C ONTACT BOROUGH COMMISSIONER OFFICE IMMEDIATELY
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01455646-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01455646-I1
- BIN
- 1064923
- BBL
- 1022360001
- Postal code
- 10034 · 176 filings
- Review type
- Standard Plan Examination
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0