What the filing says
A public-record reading of the proposed work.
Furnish and install fire protection system including sprinklers heads
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1921, on a 1,006 sq ft lot.
- Built
- 1921
- Last altered
- 2022
- Floors
- 3
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6A
- Lot area
- 1,006 sq ft
- Building area
- 2,966 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 10 notices on file; the most recent was issued May 20, 2019.
- Construction
Issued May 20, 2019 — EMG WRK ORDER:DUE TO VEHICULAR IMPACT@BLDG ON 5/16/19 BLDG HAS PARTY/W SHARED W/494 AVE P.STRUCT DMG WALL PRESENTS DIAG/VERTICAL CRACKS FROM 1TO2FL @FRNT PREMISE BLDG HAS BEEN PART DEMO FROM GRD TO ROOF REMAIND OF BLDG STRUCT COMPR IMM ENGAGE PE BRACE /SHORE&WATER PROOF REMAIN OF BLDG&REPR PARTY/W WRK CONTIN SUPV BY PE FILE W/IN 2 BUSS DAYS COMMENCE
- Local law 62/91 - boilers
Issued Aug 16, 1993
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00341207-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00341207-I1
- BBL
- 3066360010
- Postal code
- 11223 · 1224 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 2