What the filing says
A public-record reading of the proposed work.
Herewith to propose install new precipitator for exhaust syst. and vent system, as per plans for existing eating and drinking establishment. filed under appl. # 123009564 no changes in occupancy, use, group or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story office building built in 1920, on a 7,406 sq ft lot.
- Built
- 1920
- Floors
- 12
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-2.5
- Lot area
- 7,406 sq ft
- Building area
- 82,878 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 82 notices on file; the most recent was issued Feb 18, 2021.
- Hazardous condition (facade)
Issued Feb 18, 2021 — CYCLE 9B UNSAFE REPORT FILED
- Facade safety program
Issued Feb 21, 2018
- Local law 11/98 - facade
Issued Aug 21, 2012 — CYCLE 7 UNSAFE REPORT WAS FILED
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00716217-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00716217-I1
- BIN
- 1017227
- BBL
- 1008680008
- Postal code
- 10016 · 1124 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 12
- Proposed dwelling units
- 12








