What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story health facility built in 1974, on a 109,965 sq ft lot.
- Built
- 1974
- Floors
- 4
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R5
- Lot area
- 109,965 sq ft
- Building area
- 128,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 84 notices on file; the most recent was issued Mar 3, 2026.
- Construction
Issued Mar 3, 2026 — FTM BLDG IN CODE COMPLIANT MANNER-OBSVD UPTO 7 PARAPET WALL SECTIONS BUT NOT LIMITED TOO THAT ARE SLIGHTLY LEANING INWARD TOWARD ROOF DECK DUE TO DETERIORATED MORTAR JOINTS ON EXTERIOR EALL TO THE BLDG. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D T/BE COMPL FOR 2025. SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 BY 03/17/2026
- Construction
Issued Mar 3, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-HAZ FACADE CONDITIONS WERE FOUND ON EXP4,OBSVD SEVERAL AREAS W/LOOSE,UNSTABLE,DISLODGED,DETACHING BRICKS W/CRACKS & DETERIORATED MORTAR.THESE STRUCT DEFICIENCIES WERE DEEMED TO PRESENT AN IMMED HAZ TO PUBLIC SAFETY.VACATE ALL AREAS ALONG EXP1&ACCESS TO THE PARKING AREAS UNTIL HAZ COND HAVE BEEN REMEDIED
- Construction
Issued Mar 3, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ COND @ VARIOUS LOCATIONS W/THE FACADE OF THE BLDG.97 AREAS CONSISTING OF LOOSE,UNSTABLE,DISLODGED, DETACHING BRICKS W/CRACKS AND DETERIORATED MORTAR.THESE DEFICIENCIES ARE AT RISK OF FALLING AND/OR COLLAPSE. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENITE BLDG&SUBMIT A CORRECTIVE ACTION PLAN
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01379174-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01379174-I1
- BBL
- 4158420100
- Postal code
- 11691 · 175 filings