What the filing says
A public-record reading of the proposed work.
Job filed to comply with the emergency work order # 370509
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story one-family home built in 1950, on a 2,200 sq ft lot.
- Built
- 1950
- Floors
- 1
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R4
- Lot area
- 2,200 sq ft
- Building area
- 1,606 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 5 notices on file; the most recent was issued Jun 18, 2026.
- Construction
Issued Jun 18, 2026 — PVO-DRIVEWAY. PRO INSPT. PI OBSRVD THE RW LOCATED ALONG EXP 4PROPERTY LINE, 5FT~ IN HEIGHT & 20FT~ IN LENGTH ALONG THEDRIVEWYADJCNTTO 39- 03 51ST AVE, IS STRUCTRLY COMPRMISD, THE RW HADCRACKD, BULGING OUTWAR D & WAS LEANING TOWARDS DRIVEWY, THE RW IS UNSTBLE & @RISK OF COLLSPE & POSE A DANGER. RMEDY:VACATE ENTIRE BLDGTIL HAZRD CONDN BEEN REMEDY
- Construction
Issued Jun 18, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT TIME OF INSPECT CRACKED AND BROKEN BRICKS AT EXP1/4 CORNER ON THE CHIMNEY. OWNER TO IMMED RETAIN NYSPE TO EVAL THE ENTIRE BLDG, PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER PERMIT, START WORK BY 8/18/26
- Construction
Issued Jun 18, 2026 — FTM RW. SINGLE FAMILY DWELLING W/ BRICKS MASONRY EXTERIOR ON INTERIOR LOT. OBSRVD @ INSPECTN CRACKED & BULGING RWLEANING TOWARDSDRIVEWAY THAT'S UNSTABLE & @ RISK OF COLLSPE. REMDY:OWNER TO IMMEDIATELY RETAIN NYSPE TO EVALUATE THE ENTIRE RW, PREPARE/FILE REPAIRDWAS W/DOB PERMANANTLY REPAIR RW UNDR PERMIT START 6/27/26 & SIGNOFF BY 9/4/26
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01428877-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 69,387 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01428877-I1
- BIN
- 4003028
- BBL
- 4002100008
- Postal code
- 11104 · 47 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1