NYC DOB record · M01450178-I1

50 Vanderbilt Avenue

50 Vanderbilt Avenue, Manhattan, NY 10017

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01450178-I1

50 Vanderbilt Avenue

Manhattan, NY 10017

Alteration filing · status dated Sep 24, 2026

Current record
Under review
Proposed scale
22 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01450178-I1 as a alteration filing at 50 Vanderbilt Avenue, Manhattan, NY 10017. Its latest published status category is Under review, dated Sep 24, 2026. The filing records 22 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 24, 2026
Proposed scale
22 proposed stories
Applicant of recordSee the 2 filings that name Acheson Doyle Partners Architects
FiledSep 23, 2026
Current recordUnder review
Proposed scale22 stories
Recorded cost$74,000

What the filing says

A public-record reading of the proposed work.

Filing herewith for interior demolition work, removal of non load bearing partitions, doors, floors and ceilings as per plans. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 22-story hotel built in 1914, on a 9,105 sq ft lot.

Built
1914
Floors
22
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C5-3
Lot area
9,105 sq ft
Building area
174,895 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 94 notices on file; the most recent was issued Dec 1, 2024.

  • Failure to post energy

    Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Non-residential elevator periodic

    Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION

  • Elevator

    Issued Nov 22, 2021

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01450178-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01450178-I1
BIN
1035374
BBL
1012790028
Review type
Standard Plan Examination
Existing stories
22
Proposed stories
22
Existing dwelling units
0
Proposed dwelling units
0
General construction