NYC DOB record · M00749060-I1

500 West End Avenue

500 West End Avenue, Manhattan, NY 10024

Alteration filing in Upper West Side (Central), Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00749060-I1

500 West End Avenue

Manhattan, NY 10024

Alteration filing · status dated Oct 22, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
80
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00749060-I1 as a alteration filing at 500 West End Avenue, Manhattan, NY 10024. Its latest published status category is Recorded as completed, dated Oct 22, 2026. The filing records 80 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 22, 2026
Proposed scale
80 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1033103Applicant of recordSee the 1560 filings that name Ashraf Corp
FiledJun 1, 2022
Current recordRecorded as completed
Proposed scale80 units
Recorded cost$9,000

What the filing says

A public-record reading of the proposed work.

Installation of pipe scaffold as per chapter 33. No change in use egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 13-story condominium built in 1915, with 82 homes, on a 13,587 sq ft lot.

Built
1915
Floors
13
Residential units
82
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R10A
Lot area
13,587 sq ft
Building area
128,324 sq ft
Historic district
Riverside-West End Historic District Extension I

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 56 notices on file; the most recent was issued Sep 25, 2024.

  • Construction

    Issued Sep 25, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 WEST ELEVATION MISSING MASONRY WITH OPEN AREA AND NO SHORING AT MAIN ENTRANCE OF BUILDING. REMEDY: REPAIR AND/OR REPLACE

  • Hazardous condition (facade)

    Issued Feb 20, 2024 — CYCLE 9C UNSAFE REPORT FILED

  • Non-residential elevator periodic

    Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00749060-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00749060-I1
BBL
1012327502
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
80
Proposed dwelling units
80
Scaffolding