NYC DOB record · M00771041-I1

501 9 Avenue

501 9 Avenue, Manhattan, NY 10018

New building filing in Chelsea-Hudson Yards, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00771041-I1

501 9 Avenue

Manhattan, NY 10018

New building · status dated Oct 6, 2026

Current record
Approved
Proposed scale
12 stories
Dwelling units
63
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00771041-I1 as a new building at 501 9 Avenue, Manhattan, NY 10018. Its latest published status category is Approved, dated Oct 6, 2026. The filing records 12 proposed stories and 63 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Oct 6, 2026
Proposed scale
12 proposed stories and 63 proposed dwelling units
Applicant of recordSee the 11 filings that name Archimaera Architecture PC
FiledSep 20, 2022
Current recordApproved
Proposed scale12 stories
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Proposed twelve (12) story + cellar mixed-use building.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00771041-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00771041-I1
BIN
1091787
BBL
1007350035
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
12
Existing dwelling units
Empty in the source
Proposed dwelling units
63
General construction