What the filing says
A public-record reading of the proposed work.
Repairing Bulging Brick as per DOB Violation
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1928, with 23 homes, on a 4,942 sq ft lot.
- Built
- 1928
- Floors
- 5
- Residential units
- 23
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6A
- Lot area
- 4,942 sq ft
- Building area
- 21,450 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 12 notices on file; the most recent was issued Jul 17, 2024.
- Immediate
Issued Jul 17, 2024 — REMEDY: INSTALL APPROX 50 LINEAR FT OF SIDEWALK SHED AT EXPO 1 (EAST 1 78 ST) TO PROTECT THE PUBLIC
- Construction
Issued Jul 16, 2024 — REQUEST FOR AN ENGINEERING REPORT DUE TO VERTICAL BRICK WORK ON 3RD FLOOR FACADE BULGING OUT CREATING HAZARDOUS CONDITIONS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01112018-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 98,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01112018-I1
- BIN
- 2011446
- BBL
- 2030440047
- Postal code
- 10457 · 583 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 25
- Proposed dwelling units
- 25








