NYC DOB record · M01383338-I1

508 West 126 Street

508 West 126 Street, Manhattan, NY 10027

Alteration filing in Manhattanville-West Harlem, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01383338-I1

508 West 126 Street

Manhattan, NY 10027

Alteration filing · status dated Sep 25, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01383338-I1 as a alteration filing at 508 West 126 Street, Manhattan, NY 10027. Its latest published status category is Approved, dated Sep 25, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 25, 2026
Proposed scale
1 proposed dwelling unit
Applicant of recordSee the 641 filings that name Always Fast Services Corp
FiledApr 7, 2026
Current recordApproved
Proposed scale1 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story one-family home built in 1920, on a 2,500 sq ft lot.

Built
1920
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R7A
Lot area
2,500 sq ft
Building area
3,750 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 45 open notices on record for this building, out of 46 notices on file; the most recent was issued Mar 18, 2025.

  • Construction

    Issued Mar 18, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED CORRO DED CORNICE WITH RUST HOLES AND ERRODED BRICK WORK ON EXP1.REMEDY:FIX AND/OR REPLACE BUILDING FACADE AND APPURTENANCES

  • Construction

    Issued Sep 27, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT TIME OF INS PECTION IT WAS OBSERVED AT EXP1 DETERIORATING,DAMAGED PARAPET CORNICE SPALLED/ERODED STONE,OPEN WINDOW AND WHAT IT SEEMED A PARTIAL ROOF COL LAPSED.REMEDY:REPAIR AND/OR REPLACE

  • Construction

    Issued May 9, 2024 — FAILURE TO MAINTAIN BUILDIDNG IN CODE COMPLIANT MANNER. AS NOTED: OBSERVED CORRODEN DAMAGED CORNICE, BROKEN/MISSING WINDOWS AND SPALLED ERODED STONES AT MULTIPLE LOCATIONS ON EPOSURE 1(NORTH EELEVATION) REMEDY: REPAIR AND/OR REPLACED

  • 42 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01383338-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01383338-I1
BIN
1059705
BBL
1019820033
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1
Sidewalk shed