What the filing says
A public-record reading of the proposed work.
Removal of non-load bearing interior partitions per enclosed drawings. beams & columns, floor tile, & plumbing risers to remain. there is no change to use, egress, occupancy, or fire protection.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 21-story office building built in 1929, on a 6,861 sq ft lot.
- Built
- 1929
- Last altered
- 2024
- Floors
- 21
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-3
- Lot area
- 6,861 sq ft
- Building area
- 134,039 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 47 notices on file; the most recent was issued Apr 29, 2021.
- Failure to post energy
Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Elevator
Issued Dec 31, 2020
- Elevator
Issued Dec 31, 2020
10 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01026001-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01026001-I1
- BBL
- 1012880051
- Postal code
- 10022 · 692 filings
- Review type
- Professional Certification
- Existing stories
- 22
- Proposed stories
- 22
- Existing dwelling units
- 0
- Proposed dwelling units
- 0