What the filing says
A public-record reading of the proposed work.
A.repair garage cmu wall as per plansb.repoint cmu wall as neededc.legalize roof framingd.replace approx. 3 damage roof joiste.brace rear wall as per plansf.resolve violations nos. 39160652lg.resolve violation no. v 091625c25-02142 & v 091725cfeu40205bs c
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1920, on a 2,480 sq ft lot.
- Built
- 1920
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R4
- Lot area
- 2,480 sq ft
- Building area
- 1,649 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Sep 17, 2025.
- Construction
Issued Sep 17, 2025 — FAILURE TO MAINTAIN.REAR WALL OF GARAGE IN DISREPAIR.REAR CMU WALL HAS CRCKS,OPEN JOISTS,&BROKEN CMU BLCKS IN MULT LOCATIONS THROUGHOUT WALL STEP CRCKS ALSO OBSRVD@REAR WALL,NO ACCESS TO INTERIOR.1.NSPE STRCT ENG TO IMMD EVAL ENT GARAGE&DSGN RPAIRS,2.FILE FOR RPAIRS BY 11/17/25, 3.OBTN PRMTS@STRT WRK BY 12/1/25
- Construction
Issued Sep 16, 2025 — AT TIME OF INSPECTION OBSERVED REAR WALL OF THE GARAGE IN STATE OF DISREPAIR, SHIFTED CMU BLOCKS, AND MISSING MORTAR,
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01320380-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 69,387 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01320380-I1
- BIN
- 4432193
- BBL
- 4023060013
- Postal code
- 11377 · 172 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








