What the filing says
A public-record reading of the proposed work.
Heavy duty sidewalk shed as per emergency declaration. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1910, with 15 homes, on a 1,390 sq ft lot.
- Built
- 1910
- Last altered
- 1988
- Floors
- 6
- Residential units
- 15
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C6-2
- Lot area
- 1,390 sq ft
- Building area
- 8,075 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 12 notices on file; the most recent was issued Sep 29, 2026.
- Immediate
Issued Sep 29, 2026 — REMEDY: INSTALL APPROXIMATELY 145 LINEAR FEET OF SIDEWALK SHED TO PROTECT 51 SPRING ST EXP 1 CONNECTING TO 215 MULBERRY EXP 2 AND APPROX 25 LINEAR FEET TO PROTECT THE REAR YARD
- Local law 62/91 - boilers
Issued Feb 27, 2001
- Local law 62/91 - boilers
Issued Feb 7, 2000
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01468523-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 80,574 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01468523-I1
- BBL
- 1004950042
- Postal code
- 10012 · 578 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 15
- Proposed dwelling units
- 15








