What the filing says
A public-record reading of the proposed work.
Interior renovation for a commercial space including modification to plumbing and sprinkler fixtures
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 11-story condominium built in 1926, with 15 homes, on a 4,937 sq ft lot.
- Built
- 1926
- Floors
- 11
- Residential units
- 15
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-3
- Lot area
- 4,937 sq ft
- Building area
- 36,666 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 20 notices on file; the most recent was issued Feb 22, 2024.
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Failure to submit
Issued Aug 21, 2022 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021
- Elevator
Issued Jun 5, 2009
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01270309-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Issued.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01270309-S1
- BBL
- 1007017503
- Postal code
- 10001 · 814 filings
- Review type
- Standard Plan Examination
- Existing stories
- 11
- Proposed stories
- 11
- Existing dwelling units
- 15
- Proposed dwelling units
- 15








