Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1912, with 24 homes, on a 4,250 sq ft lot.
- Built
- 1912
- Floors
- 6
- Residential units
- 24
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7-2
- Lot area
- 4,250 sq ft
- Building area
- 17,754 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 8 notices on file; the most recent was issued Aug 31, 2026.
- Construction
Issued Aug 31, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#370528 VIO#060326PI11203SB DATED 06/06/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 7/3/26 & START BLDG REPAIRS UNDER PERMIT BY 8/3/26 & COMPLETED/SIGNED OFF BY 10/3/26 AS OF 8/31/26 A REVISED CAP WAS NOT RESUBMITTED FOLLOWING DOB REJECTIONS. IMMED COMPLY W/COMMISSIONER'S ORDER #060326PI11203SB
- Construction
Issued Jun 3, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD CRACKS IN PARAPET @ EXP1/2 CORNER & 1/4 CORNER. EXP1 PARAPET IS LEANING OUTWARD. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN 2024. SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE REC'D BY DOB NO LATER THAN 6/17/26
- Construction
Issued Jun 3, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 MASONRY BULGING & CRACKS @ PARAPET. AT EXP1/2 & 1/4 CORNERS PARAPET APPEARS TO BE DETACHING FROM FACADE SHOWING DETERIORATED MORTAR JOINTS & A LARGE VERT MASONRY CRACKS.OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB & NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01413883-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01413883-I1
- BIN
- 1063000
- BBL
- 1021250034
- Postal code
- 10032 · 164 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 24
- Proposed dwelling units
- 24