Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story walk-up apartment building built in 1915, with 17 homes, on a 3,742 sq ft lot.
- Built
- 1915
- Last altered
- 2001
- Floors
- 6
- Residential units
- 17
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 3,742 sq ft
- Building area
- 15,408 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 15 notices on file; the most recent was issued Jul 30, 2024.
- Construction
Issued Jul 30, 2024 — EMERGENCY WORK ORDER DUE TO A SEVERE Y2 WIDE CRACK IN PARAPET PROTRUDI THROUGH THE ROOF EXP 1 ( NORTH ELE). ALSO DETERIORATED MORTAR JOINTS& CRACKS IN MASONRY @ EXP 1. EXP 2 (E)& EXP 3 (S) CRACKS IN MASONRY & SPALLING STUCCO. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES & INSTALL PUBLIC PROTECTION @ EXP 1(N ELE) & MAKE IMMEDIATE REPAIRS
- Construction
Issued Jan 19, 1990
- Construction
Issued Jan 19, 1990
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01090488-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01090488-I1
- BIN
- 2000060
- BBL
- 2022660010
- Postal code
- 10454 · 190 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 17
- Proposed dwelling units
- 17