NYC DOB record · B00479955-I1

52 Clark Street

52 Clark Street, Brooklyn, NY 11201

Alteration filing in Brooklyn Heights, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00479955-I1

52 Clark Street

Brooklyn, NY 11201

Alteration filing · status dated Sep 2, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
136
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00479955-I1 as a alteration filing at 52 Clark Street, Brooklyn, NY 11201. Its latest published status category is Recorded as completed, dated Sep 2, 2022. The filing records 136 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 2, 2022
Proposed scale
136 proposed dwelling units
Complete building dossierView all 4 filings associated with BIN 3001859Applicant of recordSee the 30 filings that name Project Tactical Solutions, LLC
FiledApr 26, 2021
Current recordRecorded as completed
Proposed scale136 units
Recorded cost$3,000

What the filing says

A public-record reading of the proposed work.

Plumbing work in conjunction with apartment combination of 2m & 2n. no change in egress, use, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story elevator apartment building built in 1927, with 141 homes, on a 14,200 sq ft lot.

Built
1927
Last altered
1990
Floors
9
Residential units
141
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
14,200 sq ft
Building area
79,460 sq ft
Historic district
Brooklyn Heights Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 56 notices on file; the most recent was issued Jun 23, 2024.

  • Failure to submit

    Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)

  • Failure to submit

    Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)

  • Plumbing

    Issued Jul 20, 2022 — I OBSERVED IN CELLAR LAUNDRY ROOM NEWLY INSTALLED COMMERCIAL GAS DRYERS, PIPING AND NO PERMITS ON FILE AND PRESENTS AN IMMINENT RISK TO PUBLIC SAFETY. YOU ARE HEREBY ORDERED TO IMMEDIATELY CORRECT THE ABOVE CONDITION BY RETAINING A LIC. PROFESSIONAL TO PERFORM ALL WORK NECESSARY TO RESTORE THE NON-COMPLIANT CONDITION(S) TO A CODE

  • 5 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00479955-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00479955-I1
BBL
3002360103
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
136
Proposed dwelling units
136