What the filing says
A public-record reading of the proposed work.
Interior reno to 40 apts: 9A, 29A, 4B, 5B, 11B, 14B, 28B, 32B, 34B, 36B, 37B, 43B, 8C, 10C, 14C, 22C, 34C, 36C, 10D, 15D, 17D, 19D, 27D, 29E, 32E, 45E, 27F, 42F/G, 15G, 29G, 43G, 14H, 18H, 21H, 40H, 43H, 45H, 6I, 18I, 21I No change in occupancy, use
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 50-story elevator apartment building built in 1986, with 414 homes, on a 28,397 sq ft lot.
- Built
- 1986
- Floors
- 50
- Residential units
- 414
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10
- Lot area
- 28,397 sq ft
- Building area
- 583,731 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01466281-I1.
- Current status updated02
The latest recorded filing status is “Prof Cert QA Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01466281-I1
- BIN
- 1089452
- BBL
- 1014840026
- Postal code
- 10021 · 547 filings
- Review type
- Professional Certification
- Existing stories
- 49
- Proposed stories
- 49
- Existing dwelling units
- 414
- Proposed dwelling units
- 414








