NYC DOB record · M01344801-I1

525 Seventh Avenue

525 Seventh Avenue, Manhattan, NY 10018

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 26, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01344801-I1

525 Seventh Avenue

Manhattan, NY 10018

Alteration filing · status dated Sep 23, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01344801-I1 as a alteration filing at 525 Seventh Avenue, Manhattan, NY 10018. Its latest published status category is Recorded as completed, dated Sep 23, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 23, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1015264Applicant of recordSee the 26 filings that name Nta Design Group, LLC
FiledFeb 11, 2026
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$25,000

What the filing says

A public-record reading of the proposed work.

Install new rough plumbing and plumbing fixtures at partial 3rd and 14th floors (Suites 310 and 1409), including pantry sinks, dishwasher with indirect waste and vacuum break, and ejector pumps. Connect new piping to existing sanitary risers. No egress

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 22-story office building built in 1925, on a 19,750 sq ft lot.

Built
1925
Floors
22
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
19,750 sq ft
Building area
411,074 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 149 notices on file; the most recent was issued Sep 15, 2017.

  • Elevator annual inspection /

    Issued Sep 15, 2017 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST

  • Elevator annual inspection /

    Issued Sep 15, 2017 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST

  • (other bldgs types) - elevator affirmation of

    Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST

  • 11 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01344801-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01344801-I1
BBL
1008140001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0