NYC DOB record · B00305568-I1

525 St Marks Avenue

525 St Marks Avenue, Brooklyn, NY 11238

Alteration filing in Crown Heights (North), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00305568-I1

525 St Marks Avenue

Brooklyn, NY 11238

Alteration filing · status dated Aug 27, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
13
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00305568-I1 as a alteration filing at 525 St Marks Avenue, Brooklyn, NY 11238. Its latest published status category is Approved, dated Aug 27, 2026. The filing records 13 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 27, 2026
Proposed scale
13 proposed dwelling units
Complete building dossierView all 6 filings associated with BIN 3028314Applicant of recordSee the 1088 filings that name Paul Perdek, PROF. ENG. PLLC
FiledJan 29, 2020
Current recordApproved
Proposed scale13 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of sidewalk shed as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story elevator apartment building built in 2019, with 22 homes, on a 4,153 sq ft lot.

Built
2019
Floors
7
Residential units
22
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
4,153 sq ft
Building area
29,718 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 7 notices on file; the most recent was issued May 16, 2025.

  • Construction

    Issued May 16, 2025 — EMERGENCY WORK ORDER-UNSAFE CONDITIONS WERE OBSVD. UNSECURE SHORING POST,DEBRIS VERTICAL NETTING,NO SAFETY MEASURES AND LOSING FRAMING MATERIALS @ EXP1. IMMED PROVIDE SAFET MEAURES IMMED REMOVE UNSAFE MATERIAL & MAINTAIN DEBRIS NETTING. COMPLETE REMOVE UNSAFE MATERIAL & MAINTAIN WORK BY NO LATER THAN 5/23/2025

  • Construction

    Issued May 6, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED UNFINISHED CONSTRCTION OPEN TO ALL ELEMENTS ON EXPOSURES. REMEDY: REPAIR AND/OR REPLACE

  • Fail to certify class

    Issued Jan 8, 2025 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00305568-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00305568-I1
BBL
3011490061
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
13
Proposed dwelling units
13