NYC DOB record · M01455378-S2

530 West 57 Street

530 West 57 Street, Manhattan, NY 10019

Alteration filing in Hell's Kitchen, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01455378-S2

530 West 57 Street

Manhattan, NY 10019

Alteration filing · status dated Sep 30, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01455378-S2 as a alteration filing at 530 West 57 Street, Manhattan, NY 10019. Its latest published status category is Approved, dated Sep 30, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 30, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1076216Applicant of recordSee the 323 filings that name Ama Consulting Engineers, PC
FiledSep 28, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$12,930

What the filing says

A public-record reading of the proposed work.

Sprinkler plans filed herewith to show the cap/removal of 14 sprinkler heads and installation of 9 new sprinkler heads. No change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story theatre built in 1937, on a 107,950 sq ft lot.

Built
1937
Last altered
2013
Floors
3
Residential units
0
Building type
Theatre
Land use
Commercial and office
Zoning district
M1-5
Lot area
107,950 sq ft
Building area
490,080 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 58 notices on file; the most recent was issued Jan 5, 2024.

  • Construction

    Issued Jan 5, 2024 — FTM.ON 11/20/23,OBSRVD UNDERSIDE OF FRAMNG FRM AMTRAK FRM AMTRAK LINE IN STATE OF DISREPAIR.OBSRVD LOOSE FIREPROOFNG,CORRODED STEEL BEAMS, TEMPORARY CLAMPS HOLDNG UP STEEL PLATES WHICH ARE HANGNG OVER AMTRAK COMPLY WITH COMMMISSIONER'S ORDER:DOB VIOLATION #112023CFEU10403AK (CONTROL #343718)

  • Construction

    Issued Nov 20, 2023 — FTM.ON 11/20/23,OBSRVD UNDERSIDE OF FRAMNG FRM AMTRAK LINE IN STATE OF DISREPAIR.OBSRVD LOOSE FIREPROOFNG,CORRODED STEEL BEAMS,TEMPORARY CLAMPS HOLDING UP STEEL PLATES WHICH ARE HANGNG OVER AMTRAK.OWNR TO ENGAGE NYS PE&ENDORSD CNTRCTR TO EVAL THE ENT BLDG OBTAIN PRMTS TO RPAIR BY 1/1/24.SIGN OFF REPAIR WRK BY 4/1/24

  • Failure to post energy

    Issued Dec 1, 2022 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01455378-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01455378-S2
BBL
1010850001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0