What the filing says
A public-record reading of the proposed work.
Installation of air conditioning system at ground floor apartment B. There is no change in use, egress or occupancy under this application
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story condominium built in 1912, with 39 homes, on a 8,554 sq ft lot.
- Built
- 1912
- Last altered
- 1965
- Floors
- 12
- Residential units
- 39
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R10A
- Lot area
- 8,554 sq ft
- Building area
- 60,292 sq ft
- Historic district
- Riverside-West End Historic District Extension I
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 44 notices on file; the most recent was issued Jul 27, 2023.
- Hazardous condition (facade)
Issued Jul 27, 2023 — CYCLE 9C UNSAFE REPORT FILED
- Failure to correct swarmp conditions (facade)
Issued Jul 23, 2023 — CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
- (other bldgs types) - elevator affirmation of
Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01317350-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01317350-I1
- BBL
- 1012337501
- Postal code
- 10024 · 483 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 43
- Proposed dwelling units
- 43








