What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story garage or fuel station built in 1926, on a 9,092 sq ft lot.
- Built
- 1926
- Last altered
- 2006
- Floors
- 4
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R8
- Lot area
- 9,092 sq ft
- Building area
- 40,160 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 63 notices on file; the most recent was issued May 7, 2025.
- Construction
Issued May 7, 2025 — EMERGENCY WORK ORDER-OBSV @ CELLAR 1,2,3,4 LEVEL REINFORCED CONC COLMN APPEARS TO BE IN STATE OF DISPAIR W/SUBSTANTIAL CONC SPALLING AND CRACKING.STEEL REINFORCED ELEMENTS OF THE STRUCT ARE EXTENSIVELY CORRODED & EXPOSED W/SPALLED CONC COVER. IMMED RETAIN A NYSPE W/QPSI CERT TO OEVERSEE THE REMAVAL OF VEHICLES&INSP REINFORECS CONC COLMNS
- Fail to certify class
Issued Apr 3, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Fail to certify class
Issued Oct 4, 2023 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00874373-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00874373-I1
- BIN
- 1059667
- BBL
- 1019760056
- Postal code
- 10027 · 349 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0