What the filing says
A public-record reading of the proposed work.
EOS + X-Ray Replacement: Remove and install new partitions and finishes on partial 5th floor in the existing hospital as per plans filed herewith only. No change to zoning, use, egress, occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story health facility built in 1955, on a 36,000 sq ft lot.
- Built
- 1955
- Last altered
- 2010
- Floors
- 12
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R9
- Lot area
- 36,000 sq ft
- Building area
- 422,128 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 9, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 147 notices on file; the most recent was issued Feb 22, 2024.
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Failure to correct swarmp conditions (facade)
Issued Feb 21, 2021 — CYCLE 8C FAILURE TO CORRECT SWARMP CONDITIONS
- Elevator
Issued Apr 10, 2001 — 1P31632
2 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01356764-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01356764-I1
- BBL
- 1014820020
- Postal code
- 10021 · 321 filings
- Review type
- Professional Certification
- Existing stories
- 9
- Proposed stories
- 9
- Existing dwelling units
- 0
- Proposed dwelling units
- 0