NYC DOB record · M01439486-I1

535 East 72 Street

535 East 72 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Lenox Hill-Roosevelt Island, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01439486-I1

535 East 72 Street

Manhattan, NY 10021

Alteration filing · status dated Sep 15, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
20
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01439486-I1 as a alteration filing at 535 East 72 Street, Manhattan, NY 10021. Its latest published status category is Approved, dated Sep 15, 2026. The filing records 5 proposed stories and 20 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 15, 2026
Proposed scale
5 proposed stories and 20 proposed dwelling units
Applicant of recordSee the 5 filings that name Wla Engineering, P.C.
FiledAug 13, 2026
Current recordApproved
Proposed scale5 stories
Recorded cost$20,094

What the filing says

A public-record reading of the proposed work.

Fire escape repair. No change in use, occupancy, or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1910, with 20 homes, on a 3,217 sq ft lot.

Built
1910
Floors
5
Residential units
20
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R10
Lot area
3,217 sq ft
Building area
13,500 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01439486-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01439486-I1
BIN
1046266
BBL
1014840023
Review type
Professional Certification
Existing stories
5
Proposed stories
5
Existing dwelling units
20
Proposed dwelling units
20
General construction