What the filing says
A public-record reading of the proposed work.
Installation of a 8 ton capacity split system on floor 001 and low roof. no change to egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 2018, with 70 homes, on a 11,667 sq ft lot.
- Built
- 2018
- Last altered
- 2017
- Floors
- 7
- Residential units
- 70
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-1
- Lot area
- 11,667 sq ft
- Building area
- 52,717 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01451554-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 80,574 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01451554-I1
- BIN
- 2129611
- BBL
- 2025810016
- Postal code
- 10455 · 228 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 70
- Proposed dwelling units
- 70








