What the filing says
A public-record reading of the proposed work.
The West, South, and bulkhead exterior wall brick veneers shall be repaired for the entire exposed height of the building.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 11-story hotel built in 2010, on a 10,042 sq ft lot.
- Built
- 2010
- Floors
- 11
- Residential units
- 0
- Building type
- Hotel
- Land use
- Commercial and office
- Zoning district
- R8
- Lot area
- 10,042 sq ft
- Building area
- 61,700 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 50 notices on file; the most recent was issued Feb 3, 2026.
- Construction
Issued Feb 3, 2026 — FTM BLDG. OBSRVD ON EXP 1,2&4 MISSING COPING STONE @ SOME SECTION ON PARAPET. EXP 1 N.ELEV DAMAGED MORTAR JOINTS ON PARAPET BRICK WRK. EXP3 W.ELEV: DAMAGED, DEMOLISHED BRICK WALL, FROM 2ND FLR TO PARAPET REMEDY: REPAIR/REPLACE DAMAGED MASONRY BRICKS & COPING STONE & DMAGED MORTAR JOINTS
- Construction
Issued Sep 12, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTE: OBSERVE @ EXP 4(W.ELEV) LARGE VERTICLE CRACKS @ MASONRY ON SW CORNER. ALSO OBSERVED OPEN SECTIONS OF BRICKS @ EXP#1/3 (N/S ELEV) NE & SE CORNERS, AND MISSING COPING @ ROOF PARAPET WALL & LARGE STEP CRACKS AT BULKHEAD ON SE/SW CORNERS. REMEDY: FIX AND/OR REPLACE
- Hazardous condition (facade)
Issued Jun 3, 2024 — CYCLE 9A UNSAFE REPORT FILED
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00973266-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00973266-I1
- BIN
- 1090197
- BBL
- 1010760051
- Postal code
- 10036 · 371 filings
- Review type
- Standard Plan Examination
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 176
- Proposed dwelling units
- 176