NYC DOB record · B00528655-S7

540 Graham Avenue

540 Graham Avenue, Brooklyn, NY 11222

New building filing in Greenpoint, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00528655-S7

540 Graham Avenue

Brooklyn, NY 11222

New building · status dated Nov 8, 2023

Current record
Recorded as completed
Proposed scale
5 stories
Dwelling units
25
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00528655-S7 as a new building at 540 Graham Avenue, Brooklyn, NY 11222. Its latest published status category is Recorded as completed, dated Nov 8, 2023. The filing records 5 proposed stories and 25 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Recorded as completed
Latest status date
Nov 8, 2023
Proposed scale
5 proposed stories and 25 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3426408Applicant of recordSee the 575 filings that name A&d Engineering, PLLC
FiledJun 15, 2021
Current recordRecorded as completed
Proposed scale5 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Plumbing and sprinkler work as per plans filed

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a elevator apartment building built in 2023, with 25 homes, on a 4,784 sq ft lot.

Built
2023
Residential units
25
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6B
Lot area
4,784 sq ft
Building area
23,909 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00528655-S7.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00528655-S7
BBL
3027010001
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
5
Existing dwelling units
Empty in the source
Proposed dwelling units
25
plumbingsprinkler