What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1939, with 127 homes, on a 120,325 sq ft lot.
- Built
- 1939
- Last altered
- 2017
- Floors
- 6
- Residential units
- 127
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R4
- Lot area
- 120,325 sq ft
- Building area
- 151,500 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 118 notices on file; the most recent was issued Feb 22, 2022.
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- Construction
Issued May 22, 2017
- Facade safety program
Issued Feb 16, 2017
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X00858127-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X00858127-I1
- BIN
- 2084740
- BBL
- 2058451799
- Postal code
- 10471 · 75 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 127
- Proposed dwelling units
- 127








