NYC DOB record · Q01086642-I1

546 Beach 135 Street

546 Beach 135 Street, Queens, NY 11694

Alteration filing in Breezy Point-Belle Harbor-Rockaway Park-Broad Channel, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01086642-I1

546 Beach 135 Street

Queens, NY 11694

Alteration filing · status dated Oct 14, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01086642-I1 as a alteration filing at 546 Beach 135 Street, Queens, NY 11694. Its latest published status category is Approved, dated Oct 14, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 14, 2026
Proposed scale
1 proposed dwelling unit
Applicant of recordSee the 39 filings that name Anthony Bonsignore, RA
FiledAug 9, 2024
Current recordApproved
Proposed scale1 units
Recorded cost$48,000

What the filing says

A public-record reading of the proposed work.

Replace/relocate gas and plumbing fixtures on the cellar & 1st floors, replace and install new plumbing fixtures on the 2nd floor

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01086642-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01086642-I1
BIN
4305414
BBL
4162460060
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1