NYC DOB record · S01417300-S2

55 Bowen Street

55 Bowen Street, Staten Island, NY 10304

Alteration filing in Rosebank-Shore Acres-Park Hill, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01417300-S2

55 Bowen Street

Staten Island, NY 10304

Alteration filing · status dated Sep 10, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
156
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01417300-S2 as a alteration filing at 55 Bowen Street, Staten Island, NY 10304. Its latest published status category is Approved, dated Sep 10, 2026. The filing records 6 proposed stories and 156 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 10, 2026
Proposed scale
6 proposed stories and 156 proposed dwelling units
Applicant of recordSee the 17 filings that name Michael Muroff Architect LLC
FiledSep 1, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$1.1M

What the filing says

A public-record reading of the proposed work.

Rebuild the existing fire, smoke & water damaged walls, ceiling, and floor finishes at first through sixth floors, apartments include 106-606 & 107-607 and selected hallways. no change to layouts, structural integrity, use egress or occupancy. continued.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1973, with 156 homes, on a 67,390 sq ft lot.

Built
1973
Last altered
2010
Floors
6
Residential units
156
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
67,390 sq ft
Building area
154,860 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 48 notices on file; the most recent was issued Jun 2, 2026.

  • Construction

    Issued Jun 2, 2026 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED WATER DAMAGE, BROKEN WALLS/CEILINGS, BROKEN WINDOWS AND SMOKE DAMAGE THROUGHOUT APARTMENTS AT 06-LINE (APTS# 106,206,306,406,506 AND 606). ALSO OBSERVED A SECTION OF ROOF OPEN AND EXPOSED TO ALL ELEMENTS.

  • Construction

    Issued Jun 2, 2026 — STRUCTURED RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED DAMAGES IN APARTMENT #107,207,307,407,507 AND 607 DUE TO FIRE. OBSERVED CHARRED JOISTS, WATER DAMAGES THROUGHOUT APT, SMOKE DAMAGES, BROKEN WINDOWS, AND BROKEN WALLS. THESE CONDITIONS HAVE RENDERED APTS#107,207,307,407,507,607 UNSAFE TO USE OR OCCUPY.

  • Elevator

    Issued Feb 22, 2012

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01417300-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01417300-S2
BIN
5043324
BBL
5028770025
Review type
Professional Certification
Existing stories
6
Proposed stories
6
Existing dwelling units
156
Proposed dwelling units
156
General construction