NYC DOB record · M01204538-I1

55 Fifth Avenue

55 Fifth Avenue, Manhattan, NY 10003

Alteration filing in Greenwich Village, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01204538-I1

55 Fifth Avenue

Manhattan, NY 10003

Alteration filing · status dated Sep 14, 2026

Current record
Recorded as completed
Proposed scale
19 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01204538-I1 as a alteration filing at 55 Fifth Avenue, Manhattan, NY 10003. Its latest published status category is Recorded as completed, dated Sep 14, 2026. The filing records 19 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 14, 2026
Proposed scale
19 proposed stories
The building, not the filingopen housing violations, what it sold for and every filing at BIN 1009373Applicant of recordSee the 70 filings that name Solomon Rosenzweig P.E P.C.
FiledJun 23, 2025
Current recordRecorded as completed
Proposed scale19 stories
Recorded cost$48,560

What the filing says

A public-record reading of the proposed work.

Exterior facade repairs. metal cornice repair. stone patching

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 19-story condominium built in 1912, on a 18,325 sq ft lot.

Built
1912
Floors
19
Residential units
0
Building type
Condominium
Land use
Commercial and office
Zoning district
C6-4
Lot area
18,325 sq ft
Building area
262,814 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 107 notices on file; the most recent was issued Feb 26, 2025.

  • Construction

    Issued Feb 26, 2025 — FTM FACADE & APPURT DUE TO A DEFECTIVE/LOOSE CORNICE METAL OVERLOOKING EAST 12 ST. REMDY: RETAIN NYS RDP TO INSPECT & EVALUTE 100% HAND-ON T THE ENTIRE CORNICE EXP1WEST (5TH AVE) & EXP4 SOUTH(E12ST) IN ORDER TO DETERMINE CODE COMPLIACE & ENSURE STABILITY OF CORNICE.INSTALL PUBLIC PROTECTN @ ALL LOCAT & SUBMIT REPORT TO FACADE@BUILDING.NYC BY 3.2.25

  • Construction

    Issued Feb 25, 2025 — AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL EXP.4, CORNICE IN STATE OF DISREPAIR WITH EXPOSED HOLE, METAL HANGING AND IN DANGER OF FURTHER COLLAPSE.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • 7 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01204538-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,086 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01204538-I1
BBL
1005707501
Review type
Standard Plan Examination
Existing stories
19
Proposed stories
19
Existing dwelling units
0
Proposed dwelling units
0
General constructionStructural work