What the filing says
A public-record reading of the proposed work.
Scope of work includes new convenience stairway opening, enlarging existing fire escapes, adjusting floor plate elevations and new skylight on existing roof as indicated on plans. no change in use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story condominium built in 1915, with 4 homes, on a 2,442 sq ft lot.
- Built
- 1915
- Last altered
- 2015
- Floors
- 6
- Residential units
- 4
- Building type
- Condominium
- Land use
- Walk-up apartments
- Zoning district
- C6-2A
- Lot area
- 2,442 sq ft
- Building area
- 13,870 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00844700-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “On Hold – Administrative Action.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,006 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00844700-I1
- BBL
- 1001777502
- Postal code
- 10013 · 1109 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 7
- Existing dwelling units
- 4
- Proposed dwelling units
- 4








