What the filing says
A public-record reading of the proposed work.
Associated plumbing work filed in conjunction with alteration M01451764-I1. all work filed as per plans provided herewith.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story elevator apartment building built in 1949, with 525 homes, on a 129,224 sq ft lot.
- Built
- 1949
- Floors
- 12
- Residential units
- 525
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-2
- Lot area
- 129,224 sq ft
- Building area
- 532,006 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 8 notices on file; the most recent was issued Feb 22, 2024.
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Plumbing
Issued Sep 12, 2018 — THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING JOB #122957835 DUE TO SUSPENSION OF MASTER PLUMBERS LICENSE. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT AND OBTAIN A NEW MASTER PLUMBER TO SUPERSEDE THE PLUMBING PERMIT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01451764-S1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01451764-S1
- BBL
- 1003310120
- Postal code
- 10002 · 266 filings
- Review type
- Standard Plan Examination
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 149
- Proposed dwelling units
- 149