What the filing says
A public-record reading of the proposed work.
Filing for the demolition/removal of existing steam heating boiler and associated equipment and to abandon existing 5,000 under ground oil tank related to boiler in place.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a utility property on a 37,823 sq ft lot.
- Residential units
- 0
- Building type
- Utility property
- Land use
- Transportation and utility
- Zoning district
- R3-2
- Lot area
- 37,823 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 21 notices on file; the most recent was issued Jul 29, 2024.
- Immediate
Issued Jul 29, 2024 — PROVIDE 121' LINEAR FT OF OVERHEAD PROTECTION/SIDEWALK SHED AT EXPOSUR ES #S 1&3. PROVIDE 136' LINEAR FT OF OVERHEAD PROTECTION/SIDEWALK SHED AT EXPOSURES #2&4 ENCASING THE ENTIRE PERIMETER AT THE 2 SIDEYARDS & THE FRONTS & REAR YARDS AROUND THE BUILDING FOR PROTECTION OF WORKERS/ OCCUPANTS
- Construction
Issued Jul 26, 2024 — FTM BUILDING WALLS & APPURTENANCES: ATOI BRICK FACADE EXHIBITS VERTICAL, HORIZONTAL & DIAGONAL CRACKING W/ SPALDING MASONY, MISSING GROUT AT MORTAR JOINTS & PARAPET COPING & SPALDING MASONY/TERRACOTTA LINTELS. BRICKS SHIFTING AT EXPS-1/4.
- Local law 62/91 - boilers
Issued May 4, 1998
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01457827-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01457827-I1
- BBL
- 3077590001
- Postal code
- 11234 · 1503 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0