What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300 psf
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1900, with 3 homes, on a 2,300 sq ft lot.
- Built
- 1900
- Floors
- 4
- Residential units
- 3
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6A
- Lot area
- 2,300 sq ft
- Building area
- 5,609 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued Mar 30, 2026.
- Construction
Issued Mar 30, 2026 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THERE WERE FULL HEIGHT CRCKS@EXP2 WALL ALNG CHIMNEY NEAR 1/2CRNR,ALNG CENTR OF EXP2WALL,&SOME VERT CRCKS THROUGHOUT@VARIOUS LOCATIONS IN THE EXP2 WALL.OWNR TO RTAIN NYSPE TO EVVAL THE ENT BLDG.RMVE UNPERMITTED ANNTENAE OR FILE RPAIR DWGS&LEGALIZE UNPERMITTD WRK.PERM RPAIR
- Construction
Issued Nov 17, 2025 — STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. DAMAGE OBSERVED TO HAVE BEEN SUSTAINED. PREMISES IS A FOUR STORY MIXED USE BUILDING IN WHICH PARAPET WALL AND EXTERIOR WALL HAVE CRACKS IN SEVERAL LOCATIONS AND IS IN A STATE OF DIS REPAIR
- Construction
Issued Feb 14, 2025 — FTM BLDG EXTERIOR & ALL PART THEREOF IN SAFE CONDIT. 4-STORY MASONRY STRUCT HAS MULTI HAZARDS CONDIT, SIGNIFICANT DAMAGE COPING WITH DEEP CRACKS, DEEP EXTENSIVE CRACKS/SEPARATION @ PARAPET WALL. REMDY:IMMEDLY RETAIN A NYS REGISTERED PE TO INSPECT FACADE, PARAPET & WALLPART.STAB -BLIZED/REPAIR UNSAFE CONDIT UNDR SUPERV OF PE.SUBMIT REPORT @ FACADE@
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00391809-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00391809-I1
- BBL
- 3003500008
- Postal code
- 11231 · 2635 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 4
- Proposed dwelling units
- 4








