What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 NYC building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1909, with 45 homes, on a 7,500 sq ft lot.
- Built
- 1909
- Last altered
- 1987
- Floors
- 6
- Residential units
- 45
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-2
- Lot area
- 7,500 sq ft
- Building area
- 31,902 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 21 notices on file; the most recent was issued Jul 25, 2025.
- Construction
Issued Jul 25, 2025 — FTC W/COMMISSIONER'S ORDER 347810(072425PI11203SB)DATED 07/24/25 REQUIRING OWNER TO PROVIDE SAFETY MEASURES TO PROTECT/SECURE PUBLIC @ EXP1.THE BLDG SUFFERED FROM FTM.AS OF 07/25/25 THERE ARE NO PUBLIC SAFETY MEASURES INSTALLED IN PLACE. IMMED COMPLY W/COMMISSIONER'S ORDER 347810(072425PI11203SB)TO INSTALL PUBLIC SAFETY MEASURES
- Construction
Issued Jul 24, 2025 — EMERGENCY WORK ORDER REQ'D. OBSVD SEVERLY HAZ CONDITIONS @ EXP1 SUCH AS CRACKED/LOOSE/SPALLING BRICKS,CRACKED SILLS,CRACKED TERRA COTTA STONE & DETERIORATED MORTAR JOINTS @ MULTIPLE LOCATIONS. OWNER TO IMMED PROVDE SAFETY MEASURES TO PROTECT/SECURE PUBLIC @ EXP1.INSTALL S/W SHED @ FULL LENGTH OF EXP1 ON 170 ST EXTENDED INTO COURTYARD
- Construction
Issued Jul 24, 2025 — CORRECTION ACTION PLAN REQ'D-OBSVD @ EXP1 CRACKED BRICKS,CRACKED TERRA COTTA STONES,CRACKED SILLS, & DETERIORATED MORTAR JOINTS.@ EXP2 OBSVD PARAPET LEANING INWARD&MASONRY CRACKS/DETERIORATED MORTAR.OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG&TO SUBMIT CORRECTIVE ACTION PLAN BY 8/24/25.BLDG TO BE REPAIRED UNDER PERMIT START 9/24/25
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01262374-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01262374-I1
- BIN
- 1063044
- BBL
- 1021270023
- Postal code
- 10032 · 207 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 44
- Proposed dwelling units
- 44