What the filing says
A public-record reading of the proposed work.
Work includes roofing replacement above existing concrete deck at main roof, bulkheads, & 6th fl, terrace. Installation of new insulation, flashings, & masonry coating at select locations as shown on drawings. no change use, egress, or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story condominium built in 1927, with 12 homes, on a 3,239 sq ft lot.
- Built
- 1927
- Last altered
- 1997
- Floors
- 7
- Residential units
- 12
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C5-2A
- Lot area
- 3,239 sq ft
- Building area
- 16,180 sq ft
- Historic district
- Borough Hall Skyscraper Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 21 notices on file; the most recent was issued May 29, 2024.
- Construction
Issued May 29, 2024 — FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION/PARTIAL VACATE.2NDFL LAUNDRY ROOM@EXP 2/3 CRNR W/CONCRETE SLAB SEVERELY SPALLNG@UNDERSIDE OF SLAB&EXPOSED/CORRODED REBAR.TEMP SHORNG@UNDERSIDE OF 2NDFL PARTIALLY VACATE 2NDFL LAUNDRY ROOM UNTIL 2NDFL SLAB HAS BEEN PERM RPAIRD UNDR PRMT W/RPAIR JOB COMPLETED/SIGNED OFF
- Construction
Issued May 16, 2024 — EMERGENCY WORK ORDER.UNDERSIDE OF CELLAR,1ST,&2NDFL CONE SLABS SEVERELY SPALLD@VARIOUS LOCATIONS W/STEEL REINF.SEVERELYCORRODED& EXPSD.EXIST SHORNG WAS IN PLACE@SOME AREAS@SUBCELLAR&1STFL.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343281 (101323FEU30201PN)DATED 10/13/2023,TO CMPLTE EMRGNCY SHORING
- Construction
Issued May 16, 2024 — ADDITIONAL INFORMATION:EOR R.LEVINE SUBMITTD TO FEU ON5/4/24 AN INSUFFICIENT RPORT W/PHOTOS OF EMRGNCY SHORNG WRK.EMRGNCY SHORNG WRK DIDNT APPEAR TO BE CMPLTE,BASED ON LIMITED RPORT&PHOTOS.SBMT TO FEU BY END OF DAY ON 5/20/24,SGND&SEALD RPORT(S) OF ALL RECENT EMRGNCY SHORNG WRK WHICH BEGAN ON/ARND 5/9/24
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00538797-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00538797-I1
- BBL
- 3002657502
- Postal code
- 11201 · 5869 filings
- Review type
- Standard Plan Examination
- Existing stories
- 7
- Proposed stories
- 7
- Existing dwelling units
- 12
- Proposed dwelling units
- 12