NYC DOB record · S01474485-I1

56 Van Street

56 Van Street, Staten Island, NY 10310

Full demolition filing in Port Richmond, Staten Island. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewFull demolition

NYC Department of Buildings · w9ak-ipjd · accessed Oct 31, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01474485-I1

56 Van Street

Staten Island, NY 10310

Full demolition · status dated Oct 28, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01474485-I1 as a full demolition at 56 Van Street, Staten Island, NY 10310. Its latest published status category is Under review, dated Oct 28, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Full demolition
Latest status
Under review
Latest status date
Oct 28, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 7 filings that name Perciballi Industries Inc
FiledOct 26, 2026
Current recordUnder review
Proposed scaleNot specified
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Full demolition of an existing one-story building.

Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story warehouse built in 1960, on a 9,067 sq ft lot.

Built
1960
Floors
1
Residential units
0
Building type
Warehouse
Land use
Industrial and manufacturing
Zoning district
M1-1
Lot area
9,067 sq ft
Building area
2,910 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 2 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01474485-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01474485-I1
BIN
5005148
BBL
5001870085
Review type
Standard Plan Examination
Existing stories
1
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
Empty in the source