What the filing says
A public-record reading of the proposed work.
Facade repairs consisting of stucco repair around windows, cornice repairs, non- structural window profile design replacement, and brick repointing at buildings 6-10 as per plans filed herewith. No change in Use, Egress or Occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story condominium built in 1990, with 39 homes, on a 31,580 sq ft lot.
- Built
- 1990
- Last altered
- 1990
- Floors
- 4
- Residential units
- 39
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R7A
- Lot area
- 31,580 sq ft
- Building area
- 63,730 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 19 notices on file; the most recent was issued Mar 16, 2011.
- Elevator
Issued Mar 16, 2011
- Elevator
Issued Jun 23, 2008
- Local law 62/91 - boilers
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01416972-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01416972-I1
- BBL
- 3001807501
- Postal code
- 11217 · 3239 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 39
- Proposed dwelling units
- 39








