What the filing says
A public-record reading of the proposed work.
Installation of (1) sump pump and related plumbing piping pertaining to freight elevator installation.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story elevator apartment building built in 2015, with 293 homes, on a 96,909 sq ft lot.
- Built
- 2015
- Floors
- 9
- Residential units
- 293
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R5
- Lot area
- 96,909 sq ft
- Building area
- 256,330 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 9 notices on file; the most recent was issued Feb 16, 2023.
- Construction
Issued Feb 16, 2023 — REQUEST ADDITIONAL INFORMATION.RESPNDNT IS REQ TO PROVDE A SGNED&SEALD LETTER ALNG W/DTAILD CALCLTIONS,DRWNGS FOUNDTION DTAILS,SOIL TYPES,ETC
- Elevator
Issued Jan 4, 2023 — ELEVATOR SUSTAINED WATER DAMAGE DUE TO SPRINKLER PIPE BURST. CEASE USE
- Hazardous condition (facade)
Issued Feb 21, 2022 — CYCLE 9A UNSAFE REPORT FILED
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00336139-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00336139-I1
- BBL
- 3048290005
- Postal code
- 11203 · 1009 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 293
- Proposed dwelling units
- 293








